Online Permit

Permit Number:  ROW19-01162
Permit Address:  APEX ESTATES
Permit Type: RIGHT OF WAY
Permit Subtype: MULTIPLE
Job Value: $2,875.00
Description: JOB #3518 - APEX ESTATES PATCH PERMIT
Status: FINALED
Applied Date: 8/7/2019
Approved Date: 12/27/2019
Issued Date: 1/21/2020
Permit Contacts
APPLICANT:
ABC ASPHALT, INC.
CITY DEV ENG:
EMILEY YOSHIHARA
CITY INSPECTOR:
BOB REDDING
CONTRACTOR:
ABC ASPHALT, INC.
DEVELOPER:
TWIN SILOS LLC
ONSITE SUPERVISOR:
KEARY BROWN
TRAFFIC CONTROL CONTRACTOR:
ROADSAFE TRAFFIC SYSTEMS
Fee Summary

Fee Description Fee Amount Amount Paid
use tax $57.70 $57.70
right of way $100.00 $100.00

Total $157.70 $157.70

Permit Information

PERMIT IS NOT VALID UNTIL FEES HAVE BEEN PAID

  1. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced.
  2. This permit, approved plan sets, and other required documents for this project shall be printed and kept on site until the completion of the project.
  3. Call Before You dig, Call 811 3 working days before the project starts for locations of all utility lines.
  4. Backflow assembly tests must be sent to backflow@arvada.org.

The issuance of this permit, any inspections made, or certificates of occupancy issue shall not be construed to be a permit for, nor an approval of any violation of Building Codes, Engineering Standards and Specifications, or any other code or ordinance adopted by the City of Arvada. Failure to comply with these laws or correct deficient work shall lead to an immediate revocation of the permit. Per sections 69.0 and 78-309 of the Arvada Municipal Code, the permittee shall be responsible for and bear the sole cost of any required relocation of their facilities located in or adjacent to public rights-of-way whether above or below ground. By accepting this permit, the permittee acknowledges this requirement.

Information you submit to the City of Arvada may be subject to the Colorado Open Public Records Act ("CORA"), C.R.S. ยง24-72-201 et seq. Information you submit via the City's application system will be viewable by the public. As such, do not upload any Personal Identifying Information such as driver's licenses, passports, social security numbers, credit card information, bank account information or dates of birth. The City of Arvada, its officers, employees or agents shall not be liable for damages or losses of any kind arising out of or in connection with the use or performance of information, including but not limited to, damages or losses caused by reliance upon the accuracy or timeliness of any such information, or damages incurred from the viewing, distributing, or copying of those materials.

Right Of Way Permit Information

  • No pipe is to be covered up without visual inspection of the pipe.
  • Minimum permit charge per improvement of $50.00.
  • Erosion control measures required.

Utility Locates

All utilities must be identified through the locate process prior to excavation of soil, including boring, can take place. In the event, that a City Utility cannot be located within the specified boundaries of the request area, the contractor/excavator will be notified by e-mail and/or phone of a mandatory on-site meeting to discuss alternate measures for protecting the utility. No excavation of soil, including boring, is permitted until the on-site meet has taken place and all utilities have been located. Failure to comply will be deemed unreasonable action by the contractor/excavator and may result in the contractor/excavator assuming all liability for damages to such utilities

Color   Description
Red Electric power lines, cables, conduit, and lighting cables
Orange Telecommunication, alarm or signal lines, cables, or conduit
Yellow Natural gas, oil, steam, petroleum, or other gaseous, or flammable material
Green Sewers and drain lines
Blue Drinking water
Purple Reclaimed water, irrigation, and slurry lines
Pink Temporary survey markings, unknown/unidentified facilities
White Proposed excavation limits or route
Approved By: JMI
Approved Date: 12/27/2019