| FieldName | FieldValue |
| Detailed scope of work | Main level: some drywall repair, painting, cabinet install and replacement. tile flooring replacement in kitchen bathroom and pantry.
Basement: drywall replacement and repair, texturing, painting, lvp flooring in the main area, bedroom and utility room. Tile in shower. |
| TOTAL REMODEL SQ | 1839 |
| BATHROOM REMODEL | 1 |
| KITCHEN REMODEL | 1 |
| BASEMENT FINISH | 1 |
| FOUNDATION REPAIR | |
| ELECTRICAL WORK COMPLETED | NO ELECTRICAL WORK COMPLETED |
| PLUMBING WORK COMPLETED | NO PLUMBING WORK COMPLETED |
| MECHANICAL WORK COMPLETED | NO MECHANICAL WORK COMPLETED |
| CODE YEAR | 2018 |
| TAX EXEMPT | NO |
| Inspected for Asbestos | AN ASBESTOS INSPECTION HAS BEEN / WAS CONDUCTED ON THE BUILDING MATERIALS THAT WILL BE DISTURBED BY THIS PROJECT. CLEARANCE REPORT MUST BE ONSITE. |