FieldName | FieldValue |
Detailed scope of work | Guest Bathroom Renovation:
Demolish the existing guest bathroom.
Install a new bathtub.
tile installation.
Install glass doors on the bathtub.
new bathroom floor tile.
Install a new toilet, vanity, and mirror.
paint.
Master bath Remodeling:
Demolish the existing wall between the master bedroom and the bathroom.
Extend bathroom space approximately 2-3 feet.
Relocate and reframe the bedroom entry door to fit the new layout.
Construct and install new closet framing and doors.
Fully demolish existing bathroom
Convert the bathtub area into a modern walk-in shower:
Relocate plumbing and drainage accordingly.
Install new tile work.
Install a new shower glass door.
Install new vanity, toilet, mirrors, and fixtures |
TOTAL REMODEL SQ | 50 |
BATHROOM REMODEL | 1 |
KITCHEN REMODEL | |
BASEMENT FINISH | |
FOUNDATION REPAIR | |
ELECTRICAL WORK COMPLETED | COMPLETED BY CONTRACTOR |
PLUMBING WORK COMPLETED | COMPLETED BY CONTRACTOR |
MECHANICAL WORK COMPLETED | NO MECHANICAL WORK COMPLETED |
CODE YEAR | 2018 |
TAX EXEMPT | NO |
Inspected for Asbestos | IT WAS DETERMINED THAT AN ASBESTOS INSPECTION IS NOT REQUIRED UNDER STATE LAW. |