Job Value: $0.00
Description: 24-ST-02 2024 SURFACE TREATMENT PROGRAM
Status: UNDER CONSTRUCTION
Applied Date: 3/7/2024
Approved Date: 4/2/2024
Issued Date: 4/2/2024
Permit Contacts
APPLICANT:
Christine Biddle
CIP ENGINEER:
Christine Biddle
CITY INSPECTOR:
Aaron Reed
CONTRACTOR:
A-1 CHIPSEAL CO
Fee Summary

Fee Description Fee Amount Amount Paid

Total $0.00 $0.00

Additional Information

SIGNED CONSTRUCTION PLANS :
FINAL UTILITY REPORT :
STORMWATER O&M :
SOILS/GEO TECH REPORT :
SWMP REPORT :
MATERIALS SUBMITTAL- TRAFFIC :
PROJECT END DATE :
FINAL DRAINAGE REPORT :
ESA-VCUP :
FINAL PAVEMENT DESIGNS :
FINAL TRAFFIC STUDY :
ESA-NAD :
PROJECT START DATE :
PROJECT AREA MAP :

Permit Information

PERMIT IS NOT VALID UNTIL FEES HAVE BEEN PAID

  1. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced.
  2. This permit, approved plan sets, and other required documents for this project shall be printed and kept on site until the completion of the project.
  3. Call Before You dig, Call 811 3 working days before the project starts for locations of all utility lines.
  4. Backflow assembly tests must be sent to backflow@arvada.org.

The issuance of this permit, any inspections made, or certificates of occupancy issue shall not be construed to be a permit for, nor an approval of any violation of Building Codes, Engineering Standards and Specifications, or any other code or ordinance adopted by the City of Arvada. Failure to comply with these laws or correct deficient work shall lead to an immediate revocation of the permit. Per sections 69.0 and 78-309 of the Arvada Municipal Code, the permittee shall be responsible for and bear the sole cost of any required relocation of their facilities located in or adjacent to public rights-of-way whether above or below ground. By accepting this permit, the permittee acknowledges this requirement.

Information you submit to the City of Arvada may be subject to the Colorado Open Public Records Act ("CORA"), C.R.S. ยง24-72-201 et seq. Information you submit via the City's application system will be viewable by the public. As such, do not upload any Personal Identifying Information such as driver's licenses, passports, social security numbers, credit card information, bank account information or dates of birth. The City of Arvada, its officers, employees or agents shall not be liable for damages or losses of any kind arising out of or in connection with the use or performance of information, including but not limited to, damages or losses caused by reliance upon the accuracy or timeliness of any such information, or damages incurred from the viewing, distributing, or copying of those materials.

Approved By: SB
Approved Date: 4/2/2024